Setech ST-EG100-E Guía de usuario Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 44
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
ST-EG100-E Installation and User Guide Installation
Chapter 2 Installation
2.1. Installing ST-EG100-E Ethernet Gateway
1. Remove power from the M1 Control board before making any connections.
2. Mount the ST-EG100-E to your existing Structured Wiring Box using the two (2)
ELK-SWG Circuit Board Guides, or the ELK-SWP3 Multipurpose Adapter Plate, or
four (4) ELK-SWNS1 Nylon Standoffs (see Figure 1). The ST-EG100-E should be
mounted within 10 feet of the M1 Control. The supplied cable is 16” long. For
locating the ST-EG100-E further from the panel, an optional serial cable may be
ordered directly from SETECH.
Mounting Hole
(Typical for 4.)
RJ45 Network
Jack
DC Power
Connector
DB9 Serial
Male Connector
Figure 1 - SETECH ST-EG100-E Ethernet Gateway Board
3. Connect the female end of the supplied DB9M serial ribbon cable to the male DB9
connector on the ST-EG100-E, and connect the other end of the ribbon cable to an
Elk™ M1™ control board as follows:
• For the M1 Gold control board, connect to female DB9 connector (port 0).
• For the M1EZ8 control board, connect to the female DB9 connector (port 0)
on the M1EZ8MSI Main Serial Port board.
SETECH Security & Automation Revision 1
96-300001 Page 9 of 44
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 43 44

Comentarios a estos manuales

Sin comentarios